01 / Glossary
Glossary
- Bill of quantities
- a list of works with quantities and unit prices.
- Lump sum (paušal)
- a fixed price for an item or group of works without a breakdown of quantities.
- Shell construction
- the structure: foundations, walls, slabs, roof structure, without installations or finishes.
- Screed (estrih / glazura)
- a cement layer over the floor slab or insulation that levels the floor before the final finish.
- Waterproofing
- protection against water and moisture, e.g. in bathrooms, on terraces and roofs.
- Grouting and sealing
- filling joints between tiles and sealing edges.
- Scaffolding
- a temporary structure for work at height; often charged separately.
- Temporary site connections
- power and water during the works.
- Waste removal and disposal
- loading, transport and lawful disposal of construction waste.
- Extra works (VTR)
- works not in the bill of quantities, agreed and charged separately.
- Advance payment
- payment made before the start of the works or a part of them.
- Payment claim (interim / final)
- a statement of completed works during or at the end of the job.
- Warranty period
- the period during which the contractor remedies defects.
- VAT (PDV)
- value added tax; check whether it is included in the price.